coventry pedestrian bridge

Since December of 2013, DSL Construction has been busy building the foundations including caissons down to bedrock of this beautiful pedestrian and cyclist bridge that is set to be completed in the spring of 2015.  The logistics for erecting this structure were quite a challenge, since it spans over the 417 highway. The team at DSL Construction had to burn the midnight oil as it was the only time possible to erect the large steel girders!  The bridge features beautiful glazing, lighting, landscaping and modern architecture and design.